For the Toheroa Abundance Project, the sampling involves running a line from high water down to the low water mark, called the transect line. Holes are dug at set intervals along the transect line.
For the Toheroa Abundance Project, the sampling involves running a line from high water down to the low water mark, called the transect line. Holes are dug at set intervals along the transect line.